Altona Harbour Boat Ramp Construction

Date: July 2008 to August 2008
Client: Hobsons Bay City Council
Project Value: $280,000

Works included:

  • Demolition of existing concrete boat ramp
  • Design of new pre cast concrete boat ramp
  • Supply and installation of 12 tonne pre-cast concrete toe beam, using divers to locate and place 3m down from water surface.
  • Supply and construction of boat ramp rock subgrade
  • Supply and installation of precast ramp panels including fluted surface profile
  • Supply and construction of insitu concrete works
  • Dredging of harbour immediately around ramp
     
Altona Boat Ramp (6)
Altona Boat Ramp (12)
Altona Boat Ramp (11)
Altona Boat Ramp (10)

Harbour Construction

Jetty Construction

Breakwater Construction

Pile Installation

River Bank Stabilisation

Dredging

Board Walk Construction

Car Park/ Civil Works

Floating Pontoon Installation

Insitu and Precast Concrete Works

CCFlogo   ielogo

footer_r1_c1

footer-blue          Home      About Us      Services      Recent Projects      Resources      Project Delivery      Contact Us

Specialist in Marine and Coastal Construction