Apollo Bay Marina.

Date: August 2007 to January 2008

Client: Colac Otway Council

Project Value: $1.65 Million

Works included:

  • Demolition of existing timber marina
  • Design of new floating marina
  • Site establishment of floating plant and equipment, including mobilization of 100T crane onto floating barge
  • Supply and pile driving of large 508 mm dia steel tubes using floating piling rig
  • Supply and installation of Bellingham ‘Unifloat’ pre-cast concrete pontoons
  • Supply, fabrication and installation of aluminum gangways
  • Supply and installation of electrical and water services to each marina berth
  • Signage and final commission of the marina.
Apollo BayA
Apollo Bay (5)
Apollo Bay (19)
Apollo Bay (14)
Apollo Bay (12)
AppoloBayCompleted

Harbour Construction

Jetty Construction

Breakwater Construction

Pile Installation

River Bank Stabilisation

Dredging

Board Walk Construction

Car Park/ Civil Works

Floating Pontoon Installation

Insitu and Precast Concrete Works

CCFlogo   ielogo

footer_r1_c1

footer-blue          Home      About Us      Services      Recent Projects      Resources      Project Delivery      Contact Us

Specialist in Marine and Coastal Construction