Apollo Bay Marina.
Date: August 2007 to January 2008
Client: Colac Otway Council
Project Value: $1.65 Million
Works included:
- Demolition of existing timber marina
- Design of new floating marina
- Site establishment of floating plant and equipment, including mobilization of 100T crane onto floating barge
- Supply and pile driving of large 508 mm dia steel tubes using floating piling rig
- Supply and installation of Bellingham ‘Unifloat’ pre-cast concrete pontoons
- Supply, fabrication and installation of aluminum gangways
- Supply and installation of electrical and water services to each marina berth
- Signage and final commission of the marina.