Extension of Brighton Yacht Club Breakwater - Brighton Beach
Date: (Sept 2003 - Nov 2003)
Client: Royal Brighton Yacht Club
Project Value: $290,000
Works included:
- Traffic control and pedestrian management of site to enable the safe transport of approx. 7,000 tonne of rock to end of breakwater.
- Construction of access track.
- Stabilisation of breakwater access track and site establishment.
- Construction of approx. 30 linear metre breakwater extension, including careful placement of 4 - 6 tonne toe rocks.
- Re-establishment of breakwater crest track and site reinstatement.