Extension of Brighton Yacht Club Breakwater - Brighton Beach

Date: (Sept 2003 - Nov 2003)
Client: Royal Brighton Yacht Club
Project Value: $290,000

Works included:

  • Traffic control and pedestrian management of site to enable the safe transport of approx. 7,000 tonne of rock to end of breakwater.
  • Construction of access track.
  • Stabilisation of breakwater access track and site establishment.
  • Construction of approx. 30 linear metre breakwater extension, including careful placement of 4 - 6 tonne toe rocks.
  • Re-establishment of breakwater crest track and site reinstatement.
brighton
Brighton 2

Harbour Construction

Jetty Construction

Breakwater Construction

Pile Installation

River Bank Stabilisation

Dredging

Board Walk Construction

Car Park/ Civil Works

Floating Pontoon Installation

Insitu and Precast Concrete Works