Brighton Shared Pathway – Brighton Beach

Date: (January 2005 – September 2005)
Client: Bayside City Council
Project Value: $1.8 million

Works included:

  • Construction of concrete bike path 800lm
  • Construction of rock breakwaters and revetments
  • Construction of timber groyne
  • Concrete and timber piling works
  • Sand importation and new beach construction
  • Stormwater, drainage and litter trap installation
  • Supply and installation of large precast concrete panels used in the construction of 100lm elevated section of pathway
  • Electrical public lighting installation
  • Soft landscape planting
bsp3
bsp2 bsp4
bsp1
BSPairial
bsp5
bsp6
bsp7
[Home] [Apollo Bay 2001] [Apollo Bay Marina 2008] [Altona Harbour 2001] [Altona Boat Ramp 2008] [Barwon Heads 2004] [Beaumaris 2002] [Brighton Beach 2003] [Brighton Beach] [Geelong 2002] [Port of Sale 2004] [Port Melbourne Beach 1999] [River Bank Work 2002] [Rye Beach 1999] [San Remo 1997] [St Kilda Beach 2001] [Werribee South 2002] [Williamstown Groyne 2000] [Yarra River 2006]

Harbour Construction

Jetty Construction

Breakwater Construction

Pile Installation

River Bank Stabilisation

Dredging

Board Walk Construction

Car Park/ Civil Works

Floating Pontoon Installation

Insitu and Precast Concrete Works

CCFlogo   ielogo

footer_r1_c1

footer-blue          Home      About Us      Services      Recent Projects      Resources      Project Delivery      Contact Us