Specialist in Marine and Coastal Construction

Design and Construction of Floating Jetties at 4 inner city locations along the Yarra River, Melbourne.

Date: (July 2005 – January 2006)
Client: Parks Victoria
Project Value: $1.2 Million

Works included:

  • Design and liaison with public authorities
  • Construction included the following sites:
     Melbourne Exhibition Centre, Crown Casio, Southgate and Swan Street Bridge
  • Supply and installation of 120lm of Bellingham floating pontoons
  • Steel tube piling via water based barges
  • Supply and installation of stainless steel handrails
  • Supply and installation of public lighting
  • Associated works including asphalt paving and timber jetty repairs
yarramain
yarra1 yarra7
yarra3 yarra5
yarra6 yarra4
[Apollo Bay 2001]   [Apollo Bay Marina 2008]   [Altona Harbour 2001]   [Altona Boat Ramp 2008]   [Barwon Heads 2004]   [Beaumaris 2002]   [Brighton Beach 2003]   [Brighton Beach]   [Geelong 2002]   [Port of Sale 2004]   [Port Melbourne Beach 1999]   [River Bank Work 2002]   [Rye Beach 1999]   [San Remo 1997]   [St Kilda Beach 2001]   [Werribee South 2002]   [Williamstown Groyne 2000]   [Yarra River 2006] 

Harbour Construction

Jetty Construction

Breakwater Construction

Pile Installation

River Bank Stabilisation

Dredging

Board Walk Construction

Car Park/ Civil Works

Floating Pontoon Installation

Insitu and Precast Concrete Works

CCFlogo   ielogo

footer_r1_c1

footer-blue          Home      About Us      Services      Recent Projects      Resources      Project Delivery      Contact Us